Bethesda Hospital, Claremont

ProjectsยปBethesda Hospital, Claremont

At the time of contact, Bethesda washed all their pots, pans and cooking trays by hand and needed a solution to make things easier and save some time.

The Solution.
Arcus discussed several options with the team at Bethesda and we ultimately came to a solution that included Custom Arcus Bench work, Condensate Hood and a Washtech AL8 Dishwasher. This solution meant we were able to offer a large sink bowl on the entrance bench which gave them the option to soak any larger items if need. We also had to tie in to existing benching, so by making the 45 degree angle on the corner of the exit bench we could achieve this without giving the workers around the tight kitchen a 90 degree corner to bump into.

All site bench work was carried out by our own in house team and our in house projects team made all the arrangements for sub contractors to attend site to install and commission the dishwasher and give the kitchen team a thorough run through on the operation of the machine.

youtube video thumbnail Featured Images